Home  Greywater  System  Site inspection  Permits  Detergents  Health  Contact                                              XXXX

 

 
Site inspection and quotation   
 
  • Your GreytoGreen dealer will ensure all state government guidelines are followed

  • Soil and site suitability are aceptable

  • Size of the garden to be irrigated

  • Calculate volume of greywater to be used.

  • Greywater sources required ie; laundry-bathroom or both

  • Irrigation method best suited to garden

  • Licensed plumber engaged to carry out waste plumbing requirements.

  • Licensed electrician if external power supply is required.

 

Horticultural tables for your area are used to assess the volume of greywater required. GreytoGreen do not (literally) throw all available greywater at the garden. As the practice of diverting all available greywater to the garden every day can lead to problems, the GreytoGreen system is designed to deliver the required volume at nominated intervals. 

Your quotation includes specifications on all the above and the system is guaranteed to meet those specifications.

Permits/approvals & notifications

As failure to observe regulations can incur penalties, your dealer will ensure all state and/or local government guidelines are followed. All documentation is passed to you, the owner.

Every GreytoGreen installation has plumbing to waste installed by licensed tradesmen .It is of prime importance when a site inspection is required, the individuals attending have a thorough understanding of every aspect of greywater diversion and state and local government policies and guidelines.  

Queensland State Government listing of approved greywater diversion devices   Select here 

 

New South Wales Dept of Health lists approved greywater diversion devices: Select here